Submission to the Draft  Galway County Development  Plan 2022-2028 (Stage 2) 

Lands at Montiagh Road, Baile  Chláir, Co. Galway

DOCUMENT DETAILS 

Client: Oisin Kenny 

Project Title: Lands at Montiagh Road, Baile Chláir, Co. Galway 

Project Number: 210629 

Document Title: Submission to the Draft Galway County  

Development Plan 2022-2028 (Stage 2) 

Document File Name: 2021.07.30 – Dev Plan Submission –210629– F 

Prepared By: MKO 

Tuam Road 

Galway 

Ireland 

H91 VW84

Rev Status Date Author(s) Approved By
01 Final 30.07.2021 DS CR

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 

210629 – O’Malleys Claregalway DP Submission D3 

Table of Contents 

1. PREAMBLE…………………………………………………………………………………………………………………………2 2. INTRODUCTION ………………………………………………………………………………………………………………….3 

2.1 Site Description and Constraints…………………………………………………………………………………..3 2.2 Zoning……………………………………………………………………………………………………………………….4 

3. PLANNING HISTORY…………………………………………………………………………………………………………….6 4. PLANNING POLICY CONTEXT…………………………………………………………………………………………………7 

4.1 National Planning Framework: Project Ireland 2040 ……………………………………………………….7 4.2 Regional Spatial and Economic Strategy (Northern & Western Regional Assembly) 2020-2032 ……………………………………………………………………………………………………………………………….7 4.3 Current Local Planning Policy ……………………………………………………………………………………….9 4.3.1 Galway County Development Plan 2015-2021……………………………………………………………………… 9 4.3.2 Gaeltacht Plan – Variation No. 2(b) Galway County Development Plan 2015- 2021 ………………….. 9 4.4 Galway Transport Strategy (2016) ………………………………………………………………………………10 

5. PURPOSE OF THE SUBMISSION……………………………………………………………………………………………11 

5.1 ‘Residential Phase 1’ Lands Assessment ………………………………………………………………………12 5.2 Promotion of Subject Lands to Residential Phase 1……………………………………………………….13 

6. CONCLUSION……………………………………………………………………………………………………………………16 

TABLE OF TABLES 

Table 1: Planning Applications in the vicinity of the site……………………………………………………………………………….. 6 

TABLE OF FIGURES 

Figure 1: Site Location (Site Outlined in Red)……………………………………………………………………………………………… 3 Figure 2 – OPW Flood Map………………………………………………………………………………………………………………………. 4 Figure 3 – Previous Zoning (2011-2021)……………………………………………………………………………………………………….. 4 Figure 4 – Current Zoning (Entire Site Outlined in Blue, Client-owned Lands in Red……………………………………….. 5 Figure 5 – Proposed Zoning in Draft Plan (Entire Site Outlined in Blue, Client-owned Lands in Red)…………………. 5 Figure 6. Figure 21 extracted from the RSES ………………………………………………………………………………………………. 8 Figure 7 – Indicative Masterplan ………………………………………………………………………………………………………………. 11 Figure 8 – ‘Residential – Phase 1’ lands in Baile Chláir’………………………………………………………………………………… 12 Figure 9 – Full Site in Blue. Submission Subject Site in Red…………………………………………………………………………. 14

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

1. PREAMBLE  

We note that Galway County Council are in the review process of the existing Galway County  Development Plan 2015-2021 and preparation of a new development plan for the period 2022-2028 is  underway. On behalf of our client Oisin Kenny, we wish to make a submission regarding Stage 2 (Draft)  of the Galway County Development Plan 2022-2028 (hereinafter referred to as the Draft Plan) which was  published on the 20th of May 2021 and will be on public display until the 30th of July 2021. 

We acknowledge that the development plan for the period 2022-2028 is being prepared in changed  context to the existing plan 2015-2021. New policy documents have been issued since the adoption of  Galway County Development Plan 2015-2021, in which there is a new hierarchy of spatial plans that  support the strategies of the Development Plan. A more urgent national focus on climate change  mitigation and adaption with implementation of the National Climate Action Plan will be required to  guide the drafting of policy. Relevant policy documents that have supported the context of the Draft Plan  include: 

Project Ireland 2040: National Planning Framework 

Regional Spatial and Economic Strategy for the Western and Northern Assembly 2020-2032 National Climate Action Plan 2019-2024 

MKO have been appointed by Oisin Kenny to prepare this submission on his behalf. In response to the  contents of the Volume 2: Metropolitan Area Strategic Plan of the Draft Galway County Development  Plan 2022-2028, this submission will support the request for a change in zoning from Unzoned Land to  Phase 1 Residential Land. The reader will note that the land is now better serviced with a new sewer  network running to the north of the land holding along the Montiagh Road, affording the land greater  opportunities for residential development in the near future. Additionally, the client has appointed a  design team to undertake a residential planning application directly to Galway City Council, should the  land be rezoned.  

This submission is structured as follows: 

Section 1 – Preamble  

Section 2 – Introduction  

Section 3 – Planning Policy Context 

Section 4 – Assessment 

Section 5 – Purpose of Submission 

Section 6 – Conclusion 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

2. INTRODUCTION 

The subject lands are located south of Montiagh Road and west of the N83, Baile Chláir, Co. Galway.  Figure 1 below illustrates the location of the lands within the wider area. This submission to the Draft  Galway County Development Plan (2022-2028) will present a case for development on the lands outlined  below. This report will aim to provide clarity on the constraints and opportunities at the site, and will  show that Baile Chláir, having undergone much infrastructural improvement in recent years is primed  for further development, specifically residential development. The report will show that despite  favourable zoning, Baile Chláir has failed to deliver the housing required to accommodate future  populations, and that the subject site, if rezoned can contribute towards addressing this issue.  

Figure 1: Site Location (Site Outlined in Red) 

2.1 Site Description and Constraints 

The subject lands are located south of Montiagh Road and west of the N83, on the southern approach to  the village. The land on the site is low lying flat pastureland, separated by areas of scrub and hedgerow.  There are a number of agricultural buildings on the site. No habitable dwellings are present. Currently,  the site is mainly accessed via the N83 and an access road leading from Montiagh Road.  

National Monuments Service 

There are no National Monuments or Protected Structures on or in close proximity to the site. 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 

210629 – O’Malleys Claregalway DP Submission D3 

Flood Risk 

The site is not located in a high flood risk area. See OPW flood map below. 

Figure 2 – OPW Flood Map 

Designated Areas 

There are no Special Protection Areas or Special Areas of Conservation on the site. The nearest SAC is  the Lough Corrib SAC, approximately 05km to the north of the site.  

2.2 Zoning  

Previous Zoning (Galway County Development Plan 2005 – 2011) 

As illustrated above, the northeastern section of the site had previously been zoned for Phase 1  Residential, Phase 2 Residential and Commercial uses. This demonstrates the suitability of the site for  such uses, and highlights the Authority’s confidence in the potential for development in this area of Baile  Chláir.  

Current Zoning (Galway County Development Plan Variation 2b – Gaeltacht Plan 2015-2021) 

As illustrated in the above map, the majority of the land had been downzoned in the Gaeltacht Plan 2015- 2021. The southeastern corner of the land was maintained within ‘Village Centre’ zoning.  

Figure 3 – Previous Zoning (2011-2021)

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 

210629 – O’Malleys Claregalway DP Submission D3 

Figure 4 – Current Zoning (Entire Site Outlined in Blue, Client-owned Lands in Red 

Draft Zoning (Draft Galway County Development Plan 2022-2028) 

As demonstrated in the above zoning map for the Draft Galway County Development plan, the land-use  zoning for the subject site is proposed to remain the same as the zoning in the exiting (2015-2021) County  Development Plan.  

Figure 5 – Proposed Zoning in Draft Plan (Entire Site Outlined in Blue, Client-owned Lands in Red)

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 

210629 – O’Malleys Claregalway DP Submission D3 

3. PLANNING HISTORY  

According to the Galway County Council online planning portal there are a number of applications on  the subject site as below in Table 1. 

Table 1: Planning Applications in the vicinity of the site

Pl Ref. Applicant Development Description Decision 
15252 Oisin Kenny for the erection of a five bay glass house  with a floor area of 544sqm and ancillary  development of yard, water supply  pump house and relocation of small tool  container (gross floor space 550sqm)Granted on  08/06/2015
16604 Oisin Kenny for the erection of a twelve bay glass  house with a floor area of 2560sqm and  ancillary development of yard and  associated servicesGranted on  29/06/2016

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

4. PLANNING POLICY CONTEXT 

This submission has been prepared with cognisance to the following planning policy documents; 

National Planning Framework: Project Ireland 2040 

Regional Spatial & Economic Strategy for the Northern & Western Regional Assembly 2020- 2032 

Galway County Development Plan Variation 2b Gaeltacht Plan 2015-2021 

Draft Galway County Development Plan 2022-2028 

4.1 National Planning Framework: Project Ireland 2040 

In 2018, the Government of Ireland adopted the National Planning Framework (NPF) entitled Ireland  2040 to succeed the National Spatial Strategy. The NPF comprises the Government’s proposed long-term  strategic planning framework to guide national, regional and local planning and investment decisions  over the next 25 years. It is intended that the NPF will be a strategic document that will provide the  framework for future development and investment in Ireland, providing a long-term and place-based  aspect to public policy and investment, and aiming to coordinate sectoral areas such as housing, jobs,  transport, education, health, environment, energy and communications, into an overall coherent strategy.  The NPF has a number of national policy objectives that articulate delivering on a compact urban growth  programme and are relevant to the Board’s consideration of the proposed Strategic Housing  Development. These include: 

National Policy Objective (NPO) 1 (b) relating to population growth in the region; 

National Policy Objectives (NPO) 2(a) relating to growth in our cities; 

NPO 4 relating to attractive, well-designed liveable neighbourhoods; 

NPO 5 relating to sufficient scale and quality of urban development; and 

NPO 6 relating to increased residential population and employment in urban areas. 

National Policy Objective 1b states in the context of population growth to 2040: 

‘Northern & Western Region – population growth of 180,000 additional people.’ 

There is a very significant population growth allocated to the Northern & Western Region in which  Galway is the main urban centre. In order to facilitate this population growth there will be a requirement  to develop large numbers of new houses and apartments, approx. 20,000 units based on a standard  household size of 2.7 people. Given Galway is currently acutely affected by the housing crisis there is a  considerable progress to be made in order to bring housing provision from its current under-supply to  the level required to accommodate the population growth forecasts. However, it is important that more  sustainable development patterns are established in order to facilitate targeted services and infrastructure  investment. 

4.2 Regional Spatial and Economic Strategy (Northern &  Western Regional Assembly) 2020-2032 

The Regional Spatial & Economic Strategy for the Northern & Western Regional Assembly 2020-2032 (RSES) was adopted on 24th January 2020. The purpose of the RSES is to support the implementation  of the National Planning Framework and the economic policies and objectives of the Government by  providing a long-term strategic planning and economic framework for the development of the regions.  Section 3.6 of the RSES sets out the Galway Metropolitan Area Strategic Plan (MASP). The Vision of the  MASP is that Galway will be a leading global city, renowned as a successful, sustainable, competitive,  compact and accessible city of scale that supports a high quality of life, maintains its distinctive identity  and supports its rich heritage, language and cultural experience.

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

The RSES outlines arrangements for a co-ordinated metropolitan area strategic plan (MASP) for the  Galway Metropolitan Area. The MASP has been provided with statutory underpinning to act as a 12- year strategic planning and investment framework. The MASP is an opportunity for Galway to address  recent growth legacy issues and build on key strengths, including a vibrant arts and cultural scene, year round tourism and an attractive natural setting. 

A number of strategic locations have been identified that present the opportunity and capacity to deliver  the necessary quantum of housing and development to facilitate targeted growth. Baile Chláir is identified  as one of these strategic locations, which are summarised on Page 53 of the RSES and are illustrated in  the MASP map (see map below).  

Figure 6. Figure 21 extracted from the RSES 

The table on Page 54 of the RSES identifies that the approximate land area designated for “Land Capacity  – Lands Available for Housing” in Baile Chláir is 7Ha.  

The RSES (pg 55) sets out objectives specific to Baile Chláir, as follows: 

Baile Chláir is located to the north-east of the metropolitan area, within Gaeltacht na Gaillimhe  (County Galway Gaeltacht). It supports many local shops, commercial/business units, hotel  accommodation and significant residential accommodation. The village remains a desirable  residential location benefiting from its accessibility to commute to work in the larger urban  centres of Galway City and Tuam, as well as the industrial area of Parkmore. Recent  infrastructure investment include drainage works to alleviate flooding, a new bridge, secondary  school and a new wastewater treatment plant, which have provided additional capacity to meet  the current and future needs. The development of the village requires ongoing careful  management whilst recognising its natural, built and cultural heritage assets. The implementation  of the GTS will be influential in ensuring the sustainable development of the town. 

It is clear from the above objectives that Baile Chláir is primed for further sustainable development. Many  improvements have been made to the village in preparation for this, including: New wastewater treatment plant 

New drainage works to alleviate flooding 

New bridge 

New Secondary School

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

4.3 Current Local Planning Policy 

4.3.1 Galway County Development Plan 2015-2021 

The proposed site is governed by the policies and provisions contained in the Galway County  Development Plan 2015-2021 (CDP). The plan was adopted by the Members of Galway County Council  on 26th January 2015 and the Plan is effective from 23rd February 2015. 

The CDP sets out an overall strategy for the proper planning and sustainable development of the  functional area of Galway County Council. Chapter 2 of the Plan sets out the overarching Spatial Strategy  of the County, references the development options considered for the growth and details the preferred  development option chosen. It details the Core Strategy, including the statutorily required Map and Core  Strategy Table and sets out the application of regional population targets to the Core Strategy and the  settlement hierarchy determined as part of the Spatial Strategy. Finally, it also outlines the policies and  objectives in relation to the Core and Settlement Strategy for the County. 

The Core Strategy is an integral component of the Spatial Strategy. It transposes the population targets  for Galway set out in the Regional Planning Guidelines and allocates them throughout the County, which  in turn determines the Settlement Hierarchy and provides a rationale for the amount and location of land  proposed to be zoned. 

The Core Strategy Table in the current CDP includes a list of all key towns and larger villages and  provides a population growth allocation for each for the period 2015 to 2021. The Core Strategy Table  also includes an assessment of the quantum of residentially-zoned land available to meet the population  growth allocation.  

The village of Baile Chláir is on the fourth tier of the settlement hierarchy (Other Villages) and has a total  population allocation of 245 people under the Core Strategy in the GCDP, which is equivalent to a  housing land requirement of 7.1 hectares. Taking an average household size of 2.4 (as referred to in the  section 2.4.11 of the GCDP), the growth allocation requires approximately 100 new housing units up to  2021. 

It should be noted that the duration of the Baile Chláir Local Area Plan i.e. 2005-2011 coincided with the  economic downturn and the subsequent impact that this had on housebuilding countrywide must be  taken into consideration. It is considered that the level of housing completed in Baile Chláir between  2006 and the present day has not been sufficient to accommodate the growing population of the  settlement. Furthermore, there is currently a housing crisis effecting the country as a whole. Completed  housing units are urgently required to address this crisis but also to accommodate population growth in  the settlement as per the Core Strategy set out in the Galway County Development Plan. 

4.3.2 Gaeltacht Plan – Variation No. 2(b) Galway County  Development Plan 2015- 2021 

Variation No. 2(b) to the Galway County Development Plan 2015 – 2021 incorporated the Gaeltacht Plan  into the Galway County Development Plan 2015-2021 which informs and manages the future  development of the Gaeltacht area. The Gaeltacht Plan replaces the previous planning document  Gaeltacht Plan 2008-2018. The Gaeltacht area is divided into six distinct districts: 

▪ Iorras Aithreach/Camas/Ros Muc; 

▪ Dúiche Sheoigheach; 

▪ Ceantar na nOileán/An Crompán; 

▪ Cois Fharraige; 

▪ Oileáin Árainn; 

▪ Imeall na Cathrach.

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

4.4 Galway Transport Strategy (2016) 

The Galway Transport Strategy (GTS) 2016 represents a partnership approach between Galway City  Council, Galway County Council and the National Transport Authority. It includes a series of measures  which will address the transport problems experienced across the city particularly during peak hours,  over a phased and co-ordinated basis over the next 20 years, based on priority needs. The GTS has  established that the reduction in traffic congestion requires both improvements to public transport, cycling  and walking networks and the provision of a new orbital route. 

The study area for the GTS comprises the Galway City Council administrative area, and the surrounding  hinterland within the Galway County Council administrative area, with the settlements Bearna,  Oranmore, Maigh Cuilinn (Moycullen), and Baile Chláir (Baile Chláir).  

Baile Chláir is located within the GTS area and is subject to the development policies and controls that  apply in this area under the Galway CDP. The GTS states the following: 

“Focus on main County Towns – encouraging the development of the main towns within  Galway’s catchment including Tuam, Oranmore, Athenry, Loughrea and Gort, as well  as satellite towns of Oughterard, Headford, Baile Chláir, Moycullen, Bearna and Spiddal,  and Linking these to Galway City Via a fixed route radial network, serving the main  towns and villages and a ‘Dial-a-bus’ facility to serve the rural areas outside the fixed  routes.” 

The proposed measures were arrived at following transport modelling, defining the existing transport  problems, predicting future travel demands, access mode share and assessing their mutual impacts and  interdependencies. The strategy includes traffic management, giving priority to walking cycling and bus  movements, modifications to the traffic network, management of parking activities and heavy goods  vehicles, improvements to the public realm and use of ‘smarter mobility’. These measures are designed  to both address the current significant problems and inefficiencies in the movement of people and goods  within and around the city and to establish a long-term transport plan that will underpin the future  sustainable growth of the city as supported by the Core Strategy. 

The intentions of the Galway Transport Strategy are to connect the towns and villages in the Galway  MASP Area, in order that transport and connectivity across the whole area is reliable, frequent,  sustainable, supporting future development. The GTS will strengthen the position of Baile Chláir in terms  of its proximity to Galway City and surrounding Towns and villages, and enhancing its development  potential.  

10 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

5. PURPOSE OF THE SUBMISSION  

As illustrated in the maps above, the lands are located on site which has been subject to a number of  zonings over the previous two development plans. Most notably, up until 2011 the north-eastern section  of the site was zoned for ‘Residential Phase 1’, ‘Residential Phase 2’, and ‘Commercial’. On behalf of our  client, we wish to contend that this previous zoning remains a sustainable development objective for Baile  Chláir, and respectfully request that the previous zoning, in part, be reinstated.  

The aim of this submission is to demonstrate the following points: 

There has been insufficient residential development in Baile Chláir; 

‘Phase 1 Residential’ zoned land in Baile Chláir remains largely undeveloped; 

The subject lands are a suitable and viable option to deliver housing in Baile Chláir; The subject lands are bounded on all sides by well-established roads, and benefit from excellent  access and connectivity; 

The location of the subject lands provides an opportunity to deliver consolidation of the southern  areas of Baile Chláir in a balanced manner. 

Our client has commissioned a Masterplan demonstrating the potential of the subject lands. See below  Masterplan drawing. 

Figure 7 – Indicative Masterplan 

The above masterplan demonstrates a vision for the land, considering its development potential, the  existing ‘Village Centre’ zoning on the eastern corner of the site, proximity to both Baile Chláir and  Galway City, and proximity to utilities, services and amenities in Baile Chláir.  

Essentially, we contend that the site in its entirety is suited to further development in the near future.  However, we also recognise that rezoning of lands should be carried out in a phased and measured  manner, and for this reason we contend that the section of land outlined in pink in the above masterplan  be zoned for ‘Residential Phase 1’ development. Our argument for this is set in the sections below. 

11 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

5.1 ‘Residential Phase 1’ Lands Assessment 

The extant Gaeltacht Plan is due to be replaced this year (2021). An assessment of Phase 1 Residential  lands in Baile Chláir is presented below and demonstrates that the majority of Phase 1 land remains  undeveloped to this day. 

Given the current housing crisis in Ireland in tandem with a lack of residential development, it is  considered appropriate to propose alternative sites for development. We have undertaken an assessment  to establish how many residential developments have been committed to development in Baile Chláir over the life of the current Plan. We have focused in particular on all of the lands zoned ‘Residential – Phase 1’ in the current Gaeltacht Plan in order to establish the following: 

1. What proportion of ‘Residential – Phase 1’ lands have been committed to development? 

2. Of those ‘Residential – Phase 1’ lands that have not been committed to development, is there  evidence of any constraints associated with those lands to explain why they have not been  committed to development to date and are unlikely to be committed to development by 2021  (i.e. when the extant Plan is due to expire). 

Figure 8 identifies five no. relevant parcels of land zoned ‘Residential – Phase 1’ within the LAP boundary.  1 

 5  

2  

3  

Figure 8 – ‘Residential – Phase 1’ lands in Baile Chláir’ 

12 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

We have undertaken a systematic planning search of all lands zoned ‘Residential – Phase 1’ in the Plan  boundary (i.e. areas that are shaded yellow with a red outline) above and set out the development status  and constraints associated with those lands in Table 5. The key criterion for establishing if a developer  intends to bring a site forward for development is the submission of a Commencement Notice, within the  meaning of Part II of the Building Control Regulations 1997, to the Planning Authority to indicate  commencement of works. 

The Core Strategy of the Galway County Development Plan predicts a population increase of 245 for the  village of Baile Chláir. In other words, we understand that Galway County Council’s plan-led vision for  Baile Chláir is that it can accommodate an additional approximately 100 new housing units up to 2021.  This is based on an average household size of 2.4. 

At the time of writing, there are numerous constraints associated with 3 out of the 5 areas of land that are  zoned ‘Residential -Phase 1’, primarily relating to access. The other two parcels of lands have no recent  planning history.  

Table 1 – Phase 1 Land Stats 

Map Ref Committed to Dev Evidence of  Constraints Relevant  Planning Ref  No’s No of  Units Description of  Constraints 
No Yes N/A New access would be  required due to sub standard nature of access  road and junction with  N83 National Secondary  Road. 
No Yes 06/991 Traffic Hazard
No No N/A N/A
No No 05/1510 N/A
No Yes N/A New access onto N83  required.

There are currently no extant planning permissions for residential development on Phase 1 zoned lands  in Baile Chláir and the permissions referenced for parcels 2 and 4 have since expired.  

5.2 Promotion of Subject Lands to Residential Phase 1 

The purpose of this element of the submission is to present a case for the zoning of the lands outlined in red below to ‘Residential Phase 1’. In support of this, the population growth figures in Section 4 clearly  demonstrate a need for further developable land in Galway County and in Baile Chláir, in order to  deliver the housing units required over the plan period and beyond.  

Additionally, we have demonstrated a clear problem with the coming forward of any significant  development in Baile Chláir, despite the best efforts of the Authority to zone sufficient parcels of land.  Lands zoned ‘Residential Phase 1’ in Baile Chláir remain largely undeveloped, in the midst of a country wide housing crisis. As such, we respectfully suggest that alternative lands are zoned for residential  development. 

13 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 

210629 – O’Malleys Claregalway DP Submission D3 

Figure 9 – Full Site in Blue. Submission Subject Site in Red 

Baile Chláir is strategically located within the Metropolitan Area of Galway according to the MASP map.  The Metropolitan Area has grown considerably in recent years and there is scope for the potential of  planned future growth, stated within the Draft Plan that “it is anticipated that a substantial proportion of  the increased population will be located within the county Metropolitan Area where there is greater  availability of development land with access to the city”. It is also stated within the Draft Plan that “Baile  Chláir presents opportunities for delivering growth through consolidation”. 

Consolidation of existing settlements should promote the coming forward of well serviced, accessible and  sustainable development lands, enhancing the settlement vitality of Baile Chláir. Our client’s lands are  located in proximity to roads, services and existing residential developments, as well as being within  walking distance of Baile Chláir village centre. As illustrated in the maps above, the lands are bounded  to the north, south and east by well serviced roads – one of them being the N83 National Road.  

It is our view that the portion of subject lands outlined in red in the map above, should be rezoned to  ‘Residential Phase 1’ based on the following: 

The lands now benefit from a new sewer network running to the north of the land holding along the Montiagh Road; 

The client has identified another of his own land holdings for the relocating of the  existing glasshouses and other agricultural building currently on the site; 

The client has appointed a design team to undertake a residential planning application  to submit directly to Galway City Council, should the land be rezoned; 

There is strong footpath connectivity to the town centre which meets Policy BMSP 15  Pedestrian and Cycle Network of the Draft Plan:  

“Encourage and support the development of a series of pedestrian and cycle routes  linking the residential areas to the town and local community services, where feasible”.

14 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

The lands extend to c18.5ha in its entirety and c6.9ha in the area proposed for rezoning  in this submission. The lands therefore, have the capacity to contribute towards housing  targets for Baile Chláir, as outlined in National, Regional, and Local plans, 

There are no apparent constraints associated with the subject lands; there are no  ecological designations on the site, no cultural or archaeological sites, no flood zones  or recorded flood events, and no concerns with access. Indeed, the client acknowledges  all constraints in the vicinity of the lands intends to incorporate these considerations  into any future development, to protect both the ecology and the archaeology of the  area.  

Residential development at this location meets both National and Regional policy objectives and  population growth targets as outlined in Section 4.1 and Section 4.2. The assessment of projected  population growth targets indicates that there is a significant increase required in providing a variety of  house types for a growing population, a figure that has since been challenged and is higher than initially  anticipated. Additionally, there is a distinct lack of residential development in Baile Chláir, despite  favourable zoning, necessitating consideration of alternative sites to deliver housing in the village.  

It is the request of this submission that Galway County Council recognise the potential of these lands and  the opportunity for growth in Baile Chláir. 

15 

Lands at Montiagh Road, Baile Chláir, Co. GalwayLands at Montiagh Road, Baile Chláir, Co. Galway 210629 – O’Malleys Claregalway DP Submission D3 

6. CONCLUSION 

In summary, we contend the above report demonstrates a positive case for the rezoning of the subject  lands.  

The subject lands are optimally located along the N83 National Route, to the south and west of the  established development in Baile Chláir, and benefit from existing on-site ‘Village Centre’ zoning. The  Authority has shown its confidence in the potential of the site by previously zoning it, in part for both  residential and commercial development – which we respectfully suggest is, in part, reinstated.  

Baile Chláir has been ‘upgraded’ recently, with a new wastewater treatment plant, new secondary school,  and new Flood Risk Strategy. The village is now primed for further development. However, a case for  alternative development sites has become necessary given the lack of forthcoming residential  development in Baile Chláir, despite favourable zoning.  

We therefore respectfully request that the lands discussed in this report are zoned ‘Phase 1 Residential’,  in the interests of accommodating population growth in Baile Chláir and in the national interest where  housing stock deficit has become a grave problem.